{"id":5909,"date":"2025-10-10T03:04:09","date_gmt":"2025-10-10T10:04:09","guid":{"rendered":"https:\/\/ketoan.man.net.vn\/?p=5909"},"modified":"2025-12-17T01:18:19","modified_gmt":"2025-12-17T08:18:19","slug":"ke-toan-chi-phi-xay-dung","status":"publish","type":"post","link":"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/","title":{"rendered":"Standard construction cost accounting, avoiding tax risks."},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Construction cost accounting is one of the most complex and high-risk operations in a corporate accounting system, especially for investors and construction companies. The aggregation, allocation, and capitalization of costs are subject not only to adjustments by... <\/span><a href=\"https:\/\/thuvienphapluat.vn\/van-ban\/Doanh-nghiep\/Thong-tu-200-2014-TT-BTC-huong-dan-Che-do-ke-toan-Doanh-nghiep-263599.aspx\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Circular 200\/2014\/TT-BTC<\/span><\/a><span style=\"font-weight: 400;\"> In addition to Vietnamese Accounting Standards (VAS 03, VAS 15), businesses must also strictly adhere to specialized regulations on construction investment cost management. Incorrect implementation can lead to risks such as cost discrepancies, disallowance of expenses during tax settlements, or incorrect recording of asset costs. This article provides comprehensive, up-to-date, and legally sound guidance on construction cost accounting according to the latest 2025 regulations, helping accountants and managers effectively control costs and ensure financial transparency.<\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_88 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Index<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Ke_toan_chi_phi_xay_dung_la_gi\" >What is construction cost accounting?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Ke_toan_chi_phi_xay_dung_dong_vai_tro_nhu_the_nao\" >What role does construction cost accounting play?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Phan_biet_cac_loai_hinh_ke_toan_chi_phi_xay_dung\" >Distinguish between different types of construction cost accounting.<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Cau_thanh_va_phan_loai_Chi_phi_theo_Quy_dinh_hien_hanh\" >Composition and classification of costs according to current regulations.<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Cau_truc_Tong_muc_dau_tu_Xay_dung\" >Construction Total Investment Structure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Phan_loai_chi_phi_theo_yeu_to_san_xuat\" >Classification of costs by factors of production<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Chi_phi_nao_duoc_Von_hoa_chi_phi_nao_la_Chi_phi_ky\" >Which costs are capitalized, and which are period costs?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Lap_Du_toan_va_Quan_ly_Chi_phi_dau_vao\" >Budgeting and Managing Input Costs<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Phuong_phap_xac_dinh_Dinh_muc_va_Don_gia\" >Methods for determining norms and unit prices.\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Lap_Du_toan_chi_tiet_cong_trinh\" >Prepare a detailed cost estimate for the project.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Kiem_soat_chi_phi_nguyen_vat_lieu\" >Material cost control<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Huong_dan_Hach_toan_Chi_phi_xay_dung_co_ban_TK_241\" >Instructions for Accounting for Capital Construction Costs (Account 241)<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Hach_toan_Chi_phi_mua_sam_TSCD_TK_2411\" >Accounting for Fixed Asset Purchase Costs (Account 2411)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Hach_toan_Chi_phi_xay_dung_co_ban_do_dang_TK_2412\" >Accounting for Work-in-Progress Construction Costs (Account 2412)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Hach_toan_Chi_phi_sua_chua_lon_TSCD_TK_2413\" >Accounting for major repair costs of fixed assets (Account 2413)<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Quy_trinh_Hach_toan_tong_hop_Chi_phi_TK_154\" >The process of accounting for total expenses in account 154.\u00a0<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Tap_hop_Chi_phi_san_xuat\" >Production Cost Collection<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Hach_toan_Chi_phi_san_xuat_chung_TK_627\" >Accounting for General Production Costs (Account 627)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Phuong_phap_Tap_hop_chi_phi_vao_TK_154\" >Method of accumulating costs into account 154<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Tinh_va_ghi_nhan_Gia_thanh_cong_trinh\" >Calculate and record the construction cost.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Nghiep_vu_nghiem_thu_va_ban_giao_cong_trinh\" >Project acceptance and handover procedures\u00a0<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Ke_toan_Chi_phi_Xay_dung_dac_thu_va_cac_van_de_nang_cao\" >Specialized Construction Cost Accounting and Advanced Issues<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Ke_toan_Hop_dong_Xay_dung\" >Construction Contract Accounting<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Hach_toan_Thue_gia_tri_gia_tang_GTGT_vang_lai_ngoai_tinh\" >Accounting for Value Added Tax (VAT) for temporary business trips outside the province.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Xu_ly_Chi_phi_xay_dung_do_dang_bi_huy_hoac_duyet_bo\" >Handling of cancelled or unapproved construction costs<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Ket_luan\" >Conclude<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/ketoan.man.net.vn\/en\/ke-toan-chi-phi-xay-dung\/#Thong_tin_lien_he_MAN_%E2%80%93_Master_Accountant_Network\" >Contact information MAN \u2013 Master Accountant Network<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Ke_toan_chi_phi_xay_dung_la_gi\"><\/span><b>What is construction cost accounting?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Construction cost accounting is the process of collecting, classifying, summarizing, and allocating expenses incurred in carrying out construction activities, with the aim of creating fixed assets or completing construction products for handover to the client (contractor). Construction costs are all necessary and reasonable expenses to complete a construction project or investment project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Key characteristics of construction costs:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Unique, long-term projects: Each project is one-of-a-kind, and construction time often extends across multiple accounting periods, requiring the tracking of work-in-progress costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Variable production locations (construction sites): The management of materials, labor, and machinery takes place in multiple locations, making it difficult to accurately track costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The process is complex and involves multiple parties: Costs are incurred by both the client and the contractor, requiring separate but interconnected accounting mechanisms.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">However, construction cost accounting goes beyond simply recording and aggregating incurred expenses. In the context of increasingly large investment costs, stricter legal regulations, and growing pressure to control financial performance, construction cost accounting plays a central role in cost management, project performance evaluation, and supporting management decision-making.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Ke_toan_chi_phi_xay_dung_dong_vai_tro_nhu_the_nao\"><\/span><b>What role does construction cost accounting play?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<figure id=\"attachment_6951\" aria-describedby=\"caption-attachment-6951\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6951\" src=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung.jpg\" alt=\"Vai tr\u00f2 c\u1ee7a k\u1ebf to\u00e1n chi ph\u00ed x\u00e2y d\u1ef1ng\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung.jpg 1200w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung-300x200.jpg 300w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung-1024x683.jpg 1024w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung-768x512.jpg 768w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Vai-tro-cua-ke-toan-chi-phi-xay-dung-18x12.jpg 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-6951\" class=\"wp-caption-text\">The role of construction cost accounting<\/figcaption><\/figure>\n<p><span style=\"font-weight: 400;\">Construction cost accounting plays a crucial role in the financial management of construction companies and investors:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Determining cost and cost of goods sold: This forms the basis for determining the actual cost of a completed project, thereby calculating business efficiency and preparing quotations for future contracts.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Budget control: Provides information comparing actual costs with budget estimates, helping management control and prevent cost overruns.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Determining the initial cost of fixed assets: For the investor, construction cost accounting aggregates all capitalized costs to determine the initial cost of assets formed after investment, which serves as the basis for calculating future depreciation.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Because construction cost accounting serves not only the purpose of cost control and price determination, but is also closely linked to the recognition of assets, revenue, and investment efficiency, the organizational methods and accounting approaches will not be uniform in all cases. Depending on whether the enterprise acts as the investor or the construction contractor, construction cost accounting will have completely different objects of tracking, management objectives, and accounts used, requiring clear differentiation from the outset.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Phan_biet_cac_loai_hinh_ke_toan_chi_phi_xay_dung\"><\/span><b>Distinguish between different types of construction cost accounting.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In practice, construction cost accounting is divided into two main types, depending on the role of the business:<\/span><\/p>\n<table style=\"width: 100%; border-color: #000000;\" border=\"1\" cellspacing=\"2\" cellpadding=\"12\">\n<caption><b>Board:<\/b><span style=\"font-weight: 400;\"> Types of construction cost accounting.<\/span><\/caption>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><b>Type of accounting<\/b><\/td>\n<td style=\"text-align: center;\"><b>Applicable objects<\/b><\/td>\n<td style=\"text-align: center;\"><b>Purpose<\/b><\/td>\n<td style=\"text-align: center;\"><b>Account<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Accounting by Investor<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Businesses that engage in the self-construction of fixed assets to support their production and business activities.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Capitalize costs to determine the original cost of fixed assets.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">TK 241 (Construction in progress)<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Contractor Accounting<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Construction companies execute contracts for clients.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Determine the cost or cost of goods sold for a project in order to recognize revenue and profit.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Account 154 (Work-in-progress production costs)<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Therefore, clearly distinguishing between construction cost accounting by the Investor and construction cost accounting by the Contractor not only helps businesses choose the correct key accounting account (Account 241 or Account 154), but also ensures that costs, assets, and business results are recorded in accordance with the nature of the activity. Identifying the correct accounting type from the outset is a crucial foundation for minimizing errors in cost capitalization, project cost calculation, and financial statement preparation, while also reducing risks during tax settlements and audits later on.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Cau_thanh_va_phan_loai_Chi_phi_theo_Quy_dinh_hien_hanh\"><\/span><b>Composition and classification of costs according to current regulations.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">To properly account for construction costs and effectively control them throughout the project lifecycle, businesses need to understand the components of the total investment, how to classify costs according to each accounting and construction criterion, and accurately determine which costs are capitalized and which should be recorded as expenses in the current period. The following content will clarify the cost groups according to current regulations, from the perspective of investment management to financial accounting.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Cau_truc_Tong_muc_dau_tu_Xay_dung\"><\/span><b>Construction Total Investment Structure<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">According to <\/span><a href=\"https:\/\/thuvienphapluat.vn\/van-ban\/Tai-chinh-nha-nuoc\/Thong-tu-09-2019-TT-BXD-huong-dan-xac-dinh-va-quan-ly-chi-phi-dau-tu-xay-dung-432621.aspx\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Circular 09\/2019\/TT-BXD<\/span><\/a><span style=\"font-weight: 400;\">The total investment for construction (which serves as the basis for cost management) includes the following components:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction Costs: Direct costs incurred to create a building, including materials, labor, construction machinery, and overhead. This is the focus of construction cost accounting.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Equipment Costs: Purchase price of equipment, transportation costs, installation, and commissioning costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project Management Costs: The costs incurred to organize and manage the project&#039;s implementation from preparation to completion and handover.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction investment consulting fees: Costs for hiring consultants for project planning, surveying, design, construction supervision, etc.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Other Costs: Including land compensation, mine clearance, quality inspection, commencement costs, capitalized interest costs, etc.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Contingency Costs: Contingency costs for unforeseen volume changes and price fluctuations.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Phan_loai_chi_phi_theo_yeu_to_san_xuat\"><\/span><b>Classification of costs by factors of production<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In construction cost accounting, classifying costs by production factor is a fundamental step in accurately aggregating costs, serving the purpose of calculating project costs and preparing financial statements in accordance with regulations. According to Circular 200\/TT-BTC, expenses incurred during construction are aggregated through corresponding cost accounts, clearly reflecting the nature of the costs and the accounting methods. The table below summarizes the main cost groups, cost content, and typical accounting methods in construction enterprises.<\/span><\/p>\n<table style=\"width: 100%; border-color: #000000;\" border=\"1\" cellspacing=\"2\" cellpadding=\"12\">\n<caption><b>Board:<\/b><span style=\"font-weight: 400;\"> Classification and accounting of construction costs according to Circular 200\/TT-BTC.<\/span><\/caption>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><b>Type of expense<\/b><\/td>\n<td style=\"text-align: center;\"><b>User account<\/b><\/td>\n<td style=\"text-align: center;\"><b>Content<\/b><\/td>\n<td style=\"text-align: center;\"><b>Accounting<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Direct material costs<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">TK 621<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">The value of main materials, auxiliary materials\u2026 directly involved in the construction process.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Debit account 621<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">There are accounts 152, 111, and 331.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Direct labor costs<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">TK 622<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Salaries, allowances, and deductions from salaries (social insurance, health insurance, union fees, unemployment insurance) of direct construction workers.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Debit account 622<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">There are accounts 334 and 338.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Costs of using construction machinery<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">TK 623<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Depreciation costs for construction machinery, fuel, wages for machine operators, and other costs related to machine operation.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Debit account 623<\/span><\/p>\n<p><span style=\"font-weight: 400;\">There are accounts 334 and 338.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">General production costs<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">TK 627<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Costs for on-site production management and services: Salaries of management staff, depreciation of shared fixed assets, tools and equipment, and outsourced services.<\/span><\/td>\n<td style=\"text-align: left;\"><span style=\"font-weight: 400;\">Debit account 627<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">There are accounts 111, 112, 152, 214, 334, 331<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">From the classification table above, it can be seen that construction cost accounting is not just about recording incurred costs, but also requires businesses to correctly categorize accounts, projects, and the nature of costs. Accurate classification and accounting of costs according to accounts 621, 622, 623, and 627 is fundamental to transparent project cost calculation, facilitating acceptance and final settlement, and mitigating risks during inspections, audits, and tax audits later on.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Chi_phi_nao_duoc_Von_hoa_chi_phi_nao_la_Chi_phi_ky\"><\/span><b>Which costs are capitalized, and which are period costs?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Identifying capitalized costs is a crucial step in construction cost accounting for the investor. In principle, costs are only capitalized (included in the original cost of fixed assets) if they are directly related to bringing the asset into a ready-to-use state.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Non-capitalized expenses (included in current period expenses):<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Business management expenses, selling expenses (Accounts 642, 641).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Expenses incurred in excess of reasonable limits or expenses that have been approved for cancellation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Interest expenses are not eligible for capitalization (due to the prolonged construction shutdown).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Capitalized interest is interest expense that is capitalized into the original cost of a fixed asset if it simultaneously satisfies the condition that the interest expense is directly related to the investment and construction and the construction is still ongoing (not interrupted).<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Lap_Du_toan_va_Quan_ly_Chi_phi_dau_vao\"><\/span><b>Budgeting and Managing Input Costs<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_6950\" aria-describedby=\"caption-attachment-6950\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6950\" src=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao.jpg\" alt=\"K\u1ebf to\u00e1n chi ph\u00ed x\u00e2y d\u1ef1ng trong l\u1eadp d\u1ef1 to\u00e1n v\u00e0 qu\u1ea3n l\u00fd chi ph\u00ed \u0111\u1ea7u v\u00e0o\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao.jpg 1200w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao-300x200.jpg 300w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao-1024x683.jpg 1024w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao-768x512.jpg 768w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-chi-phi-xay-dung-trong-lap-du-toan-va-quan-ly-chi-phi-dau-vao-18x12.jpg 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-6950\" class=\"wp-caption-text\">Construction cost accounting in budgeting and input cost management.<\/figcaption><\/figure>\n<p><span style=\"font-weight: 400;\">In construction cost accounting, accurate costing is only truly effective when businesses effectively control costs from the budgeting and input management stages. From correctly determining standard rates and unit prices according to regulations to meticulously tracking materials, labor, and construction machinery, each step directly impacts the accuracy of the project cost. The following content will analyze the techniques for budgeting and methods for controlling input costs according to current regulations, helping businesses proactively prevent cost overruns and discrepancies in pricing.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Phuong_phap_xac_dinh_Dinh_muc_va_Don_gia\"><\/span><b>Methods for determining norms and unit prices.\u00a0<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><a href=\"https:\/\/thuvienphapluat.vn\/van-ban\/Xay-dung-Do-thi\/Thong-tu-12-2021-TT-BXD-dinh-muc-xay-dung-487047.aspx\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Circular 12\/2021\/TT-BXD<\/span><\/a><span style=\"font-weight: 400;\"> It serves as the legal basis for preparing cost estimates and is an important data source for construction cost accounting in terms of control.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Economic and Technical Norms: Determine the necessary consumption of materials, labor, and machinery to complete a unit of construction work.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Method for determining unit prices: Construction unit prices are calculated based on the Norms multiplied by the prices of materials, labor, and machinery at the time and location of construction (unit prices are published by the Department of Construction of each province).<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Lap_Du_toan_chi_tiet_cong_trinh\"><\/span><b>Prepare a detailed cost estimate for the project.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Detailed cost estimates are an indispensable tool in construction cost accounting management:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Steps: Quantity surveying (from drawings), applying norms, determining unit prices (according to the Department of Construction), and calculating total costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Importance: Cost estimates help establish budgets and serve as a basis for comparing actual costs. If actual costs exceed estimates unreasonably, construction cost accountants need to report this so that adjustments can be made promptly.<\/span><\/li>\n<\/ul>\n<blockquote><p><b>See more:<\/b> <a href=\"https:\/\/ketoan.man.net.vn\/en\/du-toan-ngan-sach\/\"><span style=\"font-weight: 400;\">Budget estimates.<\/span><\/a><\/p><\/blockquote>\n<h3><span class=\"ez-toc-section\" id=\"Kiem_soat_chi_phi_nguyen_vat_lieu\"><\/span><b>Material cost control<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">To effectively control material costs in construction cost accounting, businesses need to establish a rigorous management process from proposal and procurement to issuance and monitoring of material consumption at the construction site. Key areas that need to be addressed include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Process: Material request (Proposal form), purchase (Contract, invoice), warehousing (Warehouse receipt form), warehouse release (Warehouse release form by project or item).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Costing of goods sold: Common methods include the weighted average cost or the First-In, First-Out (FIFO) method according to VAS 02. Construction cost accounting requires detailed tracking for each project to ensure the accuracy of cost calculations.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">After input costs have been determined through estimation and tightly controlled during the procurement of materials, labor, and construction machinery, the next crucial step in construction cost accounting is to record and account for these costs in the appropriate accounting system.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Huong_dan_Hach_toan_Chi_phi_xay_dung_co_ban_TK_241\"><\/span><b>Instructions for Accounting for Capital Construction Costs (Account 241)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Account 241 \u2013 Construction in progress is a key account when accounting for construction costs using the method of the investor or the investor constructing the asset themselves.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Account 241 reflects expenses incurred during the investment process for construction projects that have not yet been completed or for major repairs of fixed assets. This account is opened in detail for each project and item.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Hach_toan_Chi_phi_mua_sam_TSCD_TK_2411\"><\/span><b>Accounting for Fixed Asset Purchase Costs (Account 2411)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Account 2411 is used to accumulate the costs of purchasing equipment and machinery that need to be installed:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">When purchasing equipment that does not require installation: Debit Account 2411 (Price excluding VAT) Debit Account 133 (Deductible VAT) Credit Account 111, 112, 331.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Installation and commissioning costs incurred: Debit Account 2411 (Installation) Credit Accounts 111, 112, 331.<\/span><\/li>\n<\/ul>\n<h4><span class=\"ez-toc-section\" id=\"Hach_toan_Chi_phi_xay_dung_co_ban_do_dang_TK_2412\"><\/span><b>Accounting for Work-in-Progress Construction Costs (Account 2412)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Account 2412 is used to accumulate construction costs (incurred by contractors or self-performed) and other costs related to investment:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction costs incurred (from subcontractors): Debit Account 2412 (Price excluding VAT) Debit Account 133 (Deductible VAT) Credit Account 331 (Payable to contractors).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Other expenses (Project management, consulting, other expenses): Debit Account 2412, Credit Accounts 111, 112, 338.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Capitalized interest expense: Debit Account 2412, Credit Accounts 335, 341.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Completion and handover: When the project is completed, inspected, and eligible for recognition as a fixed asset (according to VAS 03): Debit Account 211 (Original cost of fixed asset) Credit Account 2412 (Completion value).<\/span><\/li>\n<\/ul>\n<h4><span class=\"ez-toc-section\" id=\"Hach_toan_Chi_phi_sua_chua_lon_TSCD_TK_2413\"><\/span><b>Accounting for major repair costs of fixed assets (Account 2413)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Only major repair costs that increase economic benefits (increased capacity, extended service life) are capitalized (according to VAS 03).<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Accumulate repair costs: Debit Account 2413, Credit Accounts 111, 152, 331, 334.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Capitalization completion: Debit Account 211 (Increase in original cost) Credit Account 2413.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In cases where costs are not capitalized: Normal repair and maintenance costs are included in the period&#039;s expenses (Debit 642) or allocated (Debit 142).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">After clarifying the principles and methods for accumulating and capitalizing work-in-progress construction costs in account 241 for the investor, the issue arises of how to organize cost accounting and calculate the cost of construction projects when the enterprise acts as the construction contractor. In this case, the focus of construction cost accounting shifts to account 154 \u2013 Work-in-progress production costs, where all construction costs are accumulated to record the cost of goods sold and determine business results.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Quy_trinh_Hach_toan_tong_hop_Chi_phi_TK_154\"><\/span><b>The process of accounting for total expenses in account 154.\u00a0<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">For businesses acting as contractors, construction cost accounting focuses on account 154 \u2013 Work-in-progress production costs.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Tap_hop_Chi_phi_san_xuat\"><\/span><b>Production Cost Collection<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Direct costs are accumulated in accounts starting with 6 (621, 622, 623, 627) for each project and item.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Hach_toan_Chi_phi_san_xuat_chung_TK_627\"><\/span><b>Accounting for General Production Costs (Account 627)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Account 627 represents indirect costs that require allocation at the end of the period. Businesses must determine a reasonable allocation method (usually based on direct labor costs or direct material costs).<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Phuong_phap_Tap_hop_chi_phi_vao_TK_154\"><\/span><b>Method of accumulating costs into account 154<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">At the end of the period, the incurred costs are transferred to calculate the project cost.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Transfer of direct costs: Debit Account 154, Credit Accounts 621, 622, 623.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Transferring allocated overhead expenses: Debit Account 154, Credit Account 627.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The principle is that cost aggregation must be detailed for each project\/item in order to calculate the cost accurately.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Tinh_va_ghi_nhan_Gia_thanh_cong_trinh\"><\/span><b>Calculate and record the construction cost.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">After accumulating all work-in-progress costs at the end of the period, the construction cost accountant proceeds to calculate the actual cost of the completed project:<\/span><\/p>\n<table style=\"width: 100%; border-color: #000000;\" border=\"1\" cellspacing=\"2\" cellpadding=\"12\">\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Cost = Beginning work-in-progress + Costs incurred during the period \u2013 Ending work-in-progress.<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Cost calculation transaction (Completed and handed over project): Debit Account 632 (Cost of goods sold) Credit Account 154 (Cost of completed project).<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Nghiep_vu_nghiem_thu_va_ban_giao_cong_trinh\"><\/span><b>Project acceptance and handover procedures\u00a0<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">When the project reaches the completion stage and is accepted by the Investor:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Revenue Recognition (According to VAS 15): Debit Account 131, Credit Account 511 (Construction Revenue), Credit Account 3331 (VAT Payable).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Transferring cost of goods sold: Debit Account 632 (Cost of goods sold) Credit Account 154.<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Ke_toan_Chi_phi_Xay_dung_dac_thu_va_cac_van_de_nang_cao\"><\/span><b>Specialized Construction Cost Accounting and Advanced Issues<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_6949\" aria-describedby=\"caption-attachment-6949\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6949\" src=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao.jpg\" alt=\"K\u1ebf to\u00e1n Chi ph\u00ed X\u00e2y d\u1ef1ng \u0111\u1eb7c th\u00f9 v\u00e0 c\u00e1c v\u1ea5n \u0111\u1ec1 n\u00e2ng cao\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao.jpg 1200w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao-300x200.jpg 300w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao-1024x683.jpg 1024w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao-768x512.jpg 768w, https:\/\/ketoan.man.net.vn\/wp-content\/uploads\/2025\/10\/Ke-toan-Chi-phi-Xay-dung-dac-thu-va-cac-van-de-nang-cao-18x12.jpg 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-6949\" class=\"wp-caption-text\">Specialized Construction Cost Accounting and Advanced Issues<\/figcaption><\/figure>\n<p><span style=\"font-weight: 400;\">Besides basic accounting procedures, construction cost accounting in practice also gives rise to many specific situations and advanced issues, directly related to long-term construction contracts, tax obligations arising from the construction site, and handling of unapproved work-in-progress expenses.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Ke_toan_Hop_dong_Xay_dung\"><\/span><b>Construction Contract Accounting<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">For long-term construction contracts, construction cost accounting must apply VAS 15.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Percentage-of-Completion Method: Revenue and expenses are recognized proportionally to the level of project completion (usually based on incurred costs compared to estimated total costs).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This is then determined by the formula:\u00a0<\/span><\/p>\n<table style=\"width: 100%; border-color: #000000;\" border=\"1\" cellspacing=\"2\" cellpadding=\"12\">\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Completion level = (Cumulative incurred costs \/ Estimated total costs) x 100%<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Handling Contract Losses: If the total estimated costs (including future expenses) exceed the contract revenue, the loss must be recognized immediately as a cost of goods sold in the period (Debit Account 632 \/ Credit Account 154).<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Hach_toan_Thue_gia_tri_gia_tang_GTGT_vang_lai_ngoai_tinh\"><\/span><b>Accounting for Value Added Tax (VAT) for temporary business trips outside the province.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Construction companies operating in provinces other than their head office must declare and pay temporary VAT. The temporary VAT, upon payment, is recorded in account 33312 (VAT payable using the direct method) and offset against the VAT payable at the head office.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Xu_ly_Chi_phi_xay_dung_do_dang_bi_huy_hoac_duyet_bo\"><\/span><b>Handling of cancelled or unapproved construction costs<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Unreasonable, unapproved, or demolition costs must be excluded from capitalized costs (Account 241) or cost of goods sold (Account 154).<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Accounting for cancellation or write-off costs: Debit Account 1388 (Recoverable from the cause) Debit Account 811 (Other expenses \u2013 if not recoverable) Credit Account 241, 154 (Reduction in work-in-progress value).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Construction cost accounting is a specialized field requiring a deep understanding of both Accounting Law and Vietnamese Accounting Standards. Strict adherence to regulations on cost capitalization and cost aggregation is crucial for ensuring the reasonableness and validity of financial data.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Ket_luan\"><\/span><b>Conclude<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Construction cost accounting is a specialized field, governed by the corporate accounting system, accounting standards, and specific construction regulations. Accurately collecting, classifying, and accounting for costs at each stage of investment or construction not only helps businesses determine the precise cost of the project and the original cost of assets, but also forms the basis for budget control, financial transparency, and risk mitigation during tax settlements and audits.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Therefore, standardizing the accounting process for construction costs according to Circular 200\/TT-BTC, correctly applying VAS 03 and VAS 15, and promptly updating new regulations are fundamental to the efficient and sustainable operation of construction companies and investors. In cases where businesses need to review their accounting systems, handle complex situations, or optimize construction investment costs, consulting with the expert accounting team at MAN \u2013 Master Accountant Network will save time and minimize potential risks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">MAN \u2013 Master Accountant Network is ready to partner with businesses in advising, standardizing, and improving the efficiency of construction cost accounting, based on legal compliance and aiming towards International Standards.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Thong_tin_lien_he_MAN_%E2%80%93_Master_Accountant_Network\"><\/span><b>Contact information MAN \u2013 Master Accountant Network<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Address: No. 19A, Street 43, Tan Thuan Ward, Ho Chi Minh City<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mobile\/Zalo: 0903 963 163 \u2013 0903 428 622<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: man@man.net.vn<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Content production by: Mr. <\/span><a href=\"https:\/\/man.net.vn\/le-hoang-tuyen\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Le Hoang Tuyen<\/span><\/a><span style=\"font-weight: 400;\"> \u2013 Founder &amp; CEO MAN \u2013 Master Accountant Network, Vietnamese CPA Auditor with over 30 years of experience in Accounting, Auditing and Financial Consulting.<\/span><\/p>\n<p style=\"text-align: right;\"><b><i>Editorial Board: MAN \u2013 Master Accountant Network<\/i><\/b><\/p>","protected":false},"excerpt":{"rendered":"<p>K\u1ebf to\u00e1n chi ph\u00ed x\u00e2y d\u1ef1ng l\u00e0 m\u1ed9t trong nh\u1eefng nghi\u1ec7p v\u1ee5 ph\u1ee9c t\u1ea1p v\u00e0 c\u00f3 m\u1ee9c \u0111\u1ed9 r\u1ee7i ro cao nh\u1ea5t trong h\u1ec7 th\u1ed1ng k\u1ebf to\u00e1n doanh nghi\u1ec7p, \u0111\u1eb7c bi\u1ec7t \u0111\u1ed1i v\u1edbi c\u00e1c ch\u1ee7 \u0111\u1ea7u t\u01b0 v\u00e0 doanh nghi\u1ec7p x\u00e2y l\u1eafp. Vi\u1ec7c t\u1eadp h\u1ee3p, ph\u00e2n b\u1ed5 v\u00e0 v\u1ed1n h\u00f3a chi ph\u00ed kh\u00f4ng ch\u1ec9 ch\u1ecbu [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":6948,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13,17],"tags":[],"class_list":["post-5909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kien-thuc","category-ke-toan-xay-dung"],"acf":[],"_links":{"self":[{"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/5909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/comments?post=5909"}],"version-history":[{"count":3,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/5909\/revisions"}],"predecessor-version":[{"id":6952,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/5909\/revisions\/6952"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/media\/6948"}],"wp:attachment":[{"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/media?parent=5909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/categories?post=5909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ketoan.man.net.vn\/en\/wp-json\/wp\/v2\/tags?post=5909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}